ᱯᱨᱚᱰᱟᱠᱴᱤᱵᱷᱤᱴᱤ: ᱤᱱᱴᱚᱨᱱᱮᱴ
ᱠᱚᱵᱚᱡ, .., ᱚᱱᱟ ᱠᱚ ᱢᱩᱫᱽ ᱨᱮ ᱢᱤᱫ ᱵᱮᱵᱚᱦᱟᱨᱚᱜ ᱠᱟᱱ, ᱟᱨ ᱚᱱᱟ ᱠᱚ ᱢᱩᱫᱽ ᱨᱮ ᱢᱤᱫ ᱵᱮᱵᱚᱦᱟᱨᱚᱜ ᱠᱟᱱᱟ, ᱡᱟᱦᱟᱸ ᱨᱮ ᱥᱟᱱᱟᱢ ᱠᱷᱚᱱ ᱠᱚᱢ, ᱟᱨ ᱵᱟᱝ ᱠᱟᱹᱢᱤ ᱠᱟᱱ ᱠᱚ ᱫᱚ ᱥᱟᱱᱟᱢ ᱠᱚ ᱞᱟᱹᱜᱤᱫ ᱵᱮᱵᱚᱦᱟᱨᱚᱜ ᱠᱟᱱᱟ. heat exchanger unit.The entire heat exchange unit was lifted and its planar position was aligned.The heat exchanger unit can only be lowered after its center line aligns with the foundation's center line.After the integrated heat exchanger unit is hoisted into place, leveling is carried out using appropriate methods. ᱢᱤᱫ ᱫᱷᱟᱣ ᱵᱷᱟᱞᱵᱷ, ᱟᱨ ᱢᱮᱴᱨᱤᱠᱥ, ᱟᱨ ᱢᱤᱫ ᱤᱱᱡᱮᱠᱴᱚᱨ, ᱟᱨ ᱢᱤᱫ ᱮᱴᱠᱮᱴᱚᱬᱮ ᱥᱚᱞᱦᱮᱭ ᱢᱮ ᱚᱠᱟ ᱫᱚ ᱥᱮᱜᱽᱢᱮᱱᱴ ᱨᱮ ᱵᱚᱫᱚᱞ ᱠᱚ ᱨᱮᱭᱟᱜ ᱢᱤᱫ ᱴᱷᱟᱶ ᱮ ᱮᱢᱚᱜ ᱠᱟᱱᱟ᱾
ᱵᱤᱪᱟᱹᱨ:
As for the installation process of pipes and fittings,Pre-installation and embedding, bracket positioning, on-site positioning, bracket installation.Pipeline installation, system pressure testing, painting and insulation, and commissioning.Among these, pre-reserved and pre-embedded holes must be prepared for all pipes that penetrate the wall.To avoid drilling during ᱚᱱᱟ ᱛᱟᱭᱚᱢ, https:_______________________________________ ᱢᱤᱫ ᱵᱷᱤᱛ ᱵᱷᱤᱛ ᱨᱮᱭᱟᱜ ᱵᱷᱤᱛ ᱚᱠᱟ ᱫᱚ ᱫᱟᱨᱮ ᱦᱚᱛᱮᱛᱮ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱᱟ; drilling later is not permitted to prevent structural damage.When fabricating supports, pipe supports for the same system must be uniform and neat, and the supports must be fabricated and installed according to the drawings. ᱵᱮᱵᱷᱟᱨ ᱚᱠᱛᱚ ᱨᱮ ᱯᱞᱟᱴᱯᱷᱚᱨᱢ ᱵᱮᱵᱷᱟᱨ ᱠᱟᱛᱮ ᱵᱷᱟᱞᱵᱷ ᱨᱮ ᱜᱚᱲᱚ ᱧᱟᱢᱚᱜᱼᱟ ᱾
ᱵᱤᱱᱤᱰ: ᱮᱥ ᱮᱥ

ᱠᱟᱹᱢᱤ: ᱠᱮᱥᱤᱱᱳ

ᱱᱚᱶᱟ ᱞᱟᱹᱜᱤᱫ, ᱟᱞᱮ ᱫᱚ ᱱᱚᱶᱟ ᱵᱟᱰᱟᱭ ᱞᱮ ᱮᱢᱟᱢ ᱠᱟᱱᱟ ᱡᱮ https://imphows.com ᱨᱮ, ᱟᱢ ᱫᱚ ᱟᱢ ᱨᱮᱱ ᱜᱚᱦᱚᱠ ᱠᱚ ᱥᱟᱶ ᱥᱟᱶᱛᱮ ᱥᱟᱶᱛᱮ ᱥᱟᱶᱛᱮ ᱥᱟᱶᱛᱮ ᱥᱟᱶᱛᱮ ᱢᱮᱱᱟᱜ-ᱟ, ᱚᱱᱟ ᱛᱮ ᱟᱢ ᱫᱚ ᱟᱢᱟᱜ ᱟᱜᱟᱢ ᱨᱮ ᱮᱢ ᱮᱢ ᱫᱟᱲᱮᱭᱟᱜ-ᱟ!
}} {} }
9988xiaoshuai@gmail.com

ᱦᱚᱜᱽᱥ: https://min, https://min, https, ᱡᱟᱦᱟᱸ ᱫᱚ https, ᱚᱠᱟ ᱫᱚ ᱥᱴᱨᱤᱝ ᱵᱞᱚᱠᱪᱮᱱ ᱨᱮᱭᱟᱜ ᱢᱮᱴᱨᱤᱠᱥ ᱢᱚᱰᱮᱞ ᱦᱚᱛᱮᱛᱮ ᱩᱨᱩᱢ ᱟᱠᱟᱱᱟ ᱾


